DB Box Installation (New Board or Relocation)
For new BTO flats, resale HDB renovations, condo fit-outs, and additions to an existing installation:
- New DB box for a new installation — sized to the circuit count, with 20% spare ways for future expansion. We supply metal-enclosed surface-mounted or flush-mounted DBs from Schneider, ABB, Hager, and Legrand.
- DB box relocation — usually needed when a renovation moves the entrance of the unit, or when the original DB is in an awkward location (behind a wardrobe, inside a bathroom, in a kitchen). We move the DB, extend or re-route the incoming cable, and reconnect every circuit to the new board.
- Sub-DB for additions — when a single addition (a home EV charger, a new aircon, a new kitchen circuit) overloads the existing DB, we install a sub-DB fed from the main, with its own dedicated MCB and RCCB.
Typical DB install time: 3–5 hours for a like-for-like replacement, 5–8 hours for a relocation with re-routing.